L&R Structural

Jun 23, 20221 min

Metro Edgewater Passes Halfway Mark

Posted on June 9th, 2022 by The Next Miami.

METRO EDGEWATER, has passed Level 20, on The Way To 51. The tower is eventually planned to top off at 32 stories.

    27