Link at Douglas Tower 1 - Roof Slab/ Pool Deck/ Level 23 Top Off Pour.

Updated: Nov 25, 2020

May 19, 2019 - Roof Slab/Pool Deck/Level 23 was Topped Off today at Link at Douglas Tower 1. Another Project ahead of Schedule. 🏗