L&R Structural

Jun 9, 20211 min

1st Mat Pour at "Downtown 1st".

Posted on June 9th, 2021 by The Next Miami.

The foundation of the 60-story Downtown 1st tower is now in place after a massive concrete pour last night, and vertical construction will now begin.

    35